首页> 美国政府科技报告 >Phase 3 Mitigative Excavations at the Baker Creek Site (8H15446) Located in theFlorida Gas Transmission Line Corridor, Hillsborough County, Florida
【24h】

Phase 3 Mitigative Excavations at the Baker Creek Site (8H15446) Located in theFlorida Gas Transmission Line Corridor, Hillsborough County, Florida

机译:Baker Creek工地的第3阶段缓解发掘(8H15446)位于佛罗里达州希尔斯伯勒县的佛罗里达天然气输送线走廊

获取原文

摘要

The objective of the Phase III excavations was to mitigate the adverse effects ofthe proposed pipeline installation to the archaeological resource through sufficient data recovery. This would be accomplished through (1) the recovery of a representative sample of the site's artifact assemblage; (2) the analysis of the lithic assemblage in terms of morphological characteristics and functions; (3) the definition and description of specific activity areas within the site; and (4) the determination of what activities were occurring at the site during its occupation.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号