首页> 美国政府科技报告 >Investigation of the Failure in GRI's Pipeline Simulation Facility Flow Loop.Final Report, October 1995-May 1996
【24h】

Investigation of the Failure in GRI's Pipeline Simulation Facility Flow Loop.Final Report, October 1995-May 1996

机译:对GRI管道模拟设施流动环路失效的调查。最终报告,1995年10月至1996年5月

获取原文

摘要

The GRI Pipeline Simulation Facility contains a 4700-foot-long loop of 24-inch-diameter pipe which can be used to simulate conditions in a natural gas pipeline. The flow loop is designed to support research, development, and demonstrations of in-line inspection technologies and equipment. A prototype magnetic flux leakage device was being propelled through the loop using compressed air as the pressurizing medium. Through a sequence of events, a fire initiated and the components of the pig train (magnetizer, instrumentation canister, and pusher pit) began to burn. The pig train travelled another 450-feet as the fire progressed forward to other components. At this point, the pig train stopped, and the pipeline became overheated and ruptured.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号