首页> 美国政府科技报告 >Assessment of the Construction Advertisement Date Process within the VirginiaDepartment of Transportation
【24h】

Assessment of the Construction Advertisement Date Process within the VirginiaDepartment of Transportation

机译:评估弗吉尼亚州交通部内的施工广告日期过程

获取原文

摘要

At any given time, there are typically 3,500 highway construction projects beingprepared for advertisement by the Virginia Department of Transportation (VDOT). To determine why some of these projects miss their projected advertisement dates, this study analyzed the process used to establish them. Because VDOT's preconstruction engineering process relies on the Program Project Monitoring System (PPMS) to relay information, the researchers devoted a significant amount of time to analyzing the strengths and weaknesses of this system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号