首页> 美国政府科技报告 >Thin Bonded Concrete Overlay and Bonding Agents
【24h】

Thin Bonded Concrete Overlay and Bonding Agents

机译:薄粘结混凝土覆盖层和粘接剂

获取原文

摘要

This report presents the construction procedures and initial performanceevaluation of a four-inch Bonded Concrete Overlay placed on Interstate 80 near Moline, Illinois. Preconstruction testing consisted of Falling Weight Deflectometer, permeability to chloride, and distress surveys. Surface preparation included: full-depth patching, partial-depth patching, bituminous material removal, shot blasting, and sand blasting. During construction of the overlay, concrete temperature, air temperature, wind speed, relative humidity, rate of evaporation, concrete slump, concrete air content, water-cement ratio, placement time, and overlay thickness were recorded. Testing conducted after construction of the overlay included: compressive strength, split tensile strength, distress surveys, location of delamination, Falling Weight Deflectometer, California Profilograph, International Roughness Index, friction, drying shrinkage of concrete, and bond strength.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号