首页> 美国政府科技报告 >Quantifying Uncertainty in Real Time Performance Measurement for Highway Winter Maintenance Operations - Phase 2, Tech Transfer Summary.
【24h】

Quantifying Uncertainty in Real Time Performance Measurement for Highway Winter Maintenance Operations - Phase 2, Tech Transfer Summary.

机译:量化公路冬季维护作业实时性能测量的不确定性 - 第二阶段,技术转移总结。

获取原文

摘要

The objectives of the project are: (1) Predict speed changes relative to baseline speed under normal conditions, based on nominal maintenance schedules and winter weather covariates (e.g., snow type, temperature, and wind speed), as measured by roadside weather stations and (2) Assess impact of winter weather covariates on traffic speed changes and estimate the effect of regular maintenance passes.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号