首页> 美国政府科技报告 >Fatigue Assessment of Bridge Members Based on In-Service Stresses
【24h】

Fatigue Assessment of Bridge Members Based on In-Service Stresses

机译:基于在役应力的桥梁疲劳评估

获取原文

摘要

This report summarizes research activities which are described in detail ininterim reports entitled 'Field Tests, Analyses, and Laboratory Tests' (Zwerneman et. at., 1996), and 'Data Acquisition System for Strain Measurements' (Zwerneman et al., 1997.) These two interim reports cover two distinct phases of the research project entitled 'Fatigue Assessment of Bridge Members Based on in-Service Stresses.' This research was undertaken to (1) evaluate the fatigue life of a specific highway bridge on which poor welds had been applied, and (2) construct a system for measurement of strains on an in-service highway bridge. The second part of the project includes demonstrating a procedure for using the measured strains to estimate remaining fatigue life and establish inspection intervals. The data acquisition system and evaluation procedures developed in this research project have the potential to provide benefits far above the cost of development and implementation. Cost savings result from improved fatigue life estimates, more accurate load ratings, and the ability to set intervals for fracture critical inspections on the basis of measured rather than computed stresses.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号