首页> 美国政府科技报告 >Pavement Treatment Effectiveness, 1995 SPS-3 and SPS-4 Site Evaluations, NationalReport
【24h】

Pavement Treatment Effectiveness, 1995 SPS-3 and SPS-4 Site Evaluations, NationalReport

机译:路面处理效果,1995年sps-3和sps-4现场评估,NationalReport

获取原文

摘要

Preventive pavement maintenance treatments selected for study under SHRP projectH-101 were placed under the LTPP program as specific pavement studies (SPS)-SPS-3 for flexible pavements and SPS-4 for portland cement concrete surfaced pavements (PCCP). The purpose of the research experiments were as follows: Define the most effective timing for application of various treatments; Evaluate the effectiveness of treatments in prolonging the life of the pavement; and Share information and experience among highway agencies and industry. The flexible pavement preventive maintenance treatments studied included: Crack sealing; Slurry seal; Chip seal; and Thin hot-mix asphalt overlay. The portland cement concrete surfaced pavement preventive maintenance treatments studied included: Joint/crack sealing, and Undersealing.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号