首页> 美国政府科技报告 >Fatigue Evaluation of the Holston River Bridge, Knox County, Tennessee
【24h】

Fatigue Evaluation of the Holston River Bridge, Knox County, Tennessee

机译:田纳西州诺克斯郡霍尔斯顿河大桥的疲劳评估

获取原文

摘要

In January 1992, the Holston River Bridge suffered a fatigue failure of the eastbound fascia girder. The crack propagated through the bottom flange of the girder and tore through the web to within a few inches of the top flange. Construction began immediately to repair the bridge and retrofit the area where the failure initiated to assure that the problem would not reoccur. The retrofit repairs are described in detail in this report. Basically the retrofit stiffened the area where the outriggers, supporting the outside lane and shoulder, frame into a contract with the University of Tennessee to evaluate the repairs and the effectiveness of the retrofit.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号