首页> 美国政府科技报告 >Engineering Guidelines for the Evaluation of Hydropower Projects. Chapter 10.Other Dams
【24h】

Engineering Guidelines for the Evaluation of Hydropower Projects. Chapter 10.Other Dams

机译:水电项目评估工程指南。第十章其他水坝

获取原文

摘要

The guidelines presented in this chapter provide staff engineers with recommendedprocedures and criteria to be used in reviewing and evaluating the safety of the following types of dams: buttress dams; concrete dams on pile foundations; timber dams; inflatable dams; stone masonry dams; water retaining power plant structures; cellular sheet pile structures; and mechanically stabilized earth dams. The staff engineers' review will be conducted to ensure that all decisions, methods, and procedures performed by licensees/exemptees, or their consultants, are sound regarding dam safety, and to ensure that the Commission's Dam Safety program objectives as stated in Part 12 of the Commission's regulations are consistent with accepted up-to-date procedures (the term licensees also refers to exemptees or applicants for license or exemptees from license where appropriate).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号