首页> 美国政府科技报告 >Penstock Inspection and Safety Assessment Program, Black Canyon Dam, BoiseProject, Idaho, Review Report, Pacific Northwest Region
【24h】

Penstock Inspection and Safety Assessment Program, Black Canyon Dam, BoiseProject, Idaho, Review Report, Pacific Northwest Region

机译:压力钢管检验和安全评估计划,黑峡谷大坝,博伊西项目,爱达荷州,审查报告,太平洋西北地区

获取原文

摘要

The penstocks at Black Canyon Dam were inspected on September 17- 18, 1996. Thefollowing tasks were performed as part of this examination: (1) The condition of the interior and linings and the exposed exterior sections and coatings of both penstocks was inspected. The exposed exterior sections and coatings of the pump penstocksm and pump discharge pipe were also examined. (2) The wall thickness of the penstocks and pump discharge pipe was determined by ultrasonic testing. (3) Appurtenances where the penstock and piping connected to the penstock change in diameter or where the water flows change in direction were inspected. (4) Joints, piping connections, and various associated operating equipment (gates, valves, etc.) were inspected. (5) A review of the emergency control system, governnor settings, and data for hydraulic transient analysis was performed. (6) Load rejections tests, an air vent analysis, and emergency gate closure tests were also performed. (7) A stress analysis was performed based on penstock wall thickness values obtained using ultrasonic techniques.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号