首页> 美国政府科技报告 >Design Summary for Repair of Prestressed Concrete Pipe Using PrestressingTendons. Centennial Wash, Jackrabbit Wash and Hassayampa River Siphons. Hayden Rhodes Aqueduct, Central Arizona Project, Arizona
【24h】

Design Summary for Repair of Prestressed Concrete Pipe Using PrestressingTendons. Centennial Wash, Jackrabbit Wash and Hassayampa River Siphons. Hayden Rhodes Aqueduct, Central Arizona Project, Arizona

机译:预应力混凝土管预应力筋修复设计总结。 Centennial Wash,Jackrabbit Wash和Hassayampa River siphons。海登罗兹渡槽,亚利桑那州中部项目,亚利桑那州

获取原文

摘要

Centennial Wash, Jackrabbit Wash and Hassayampa River siphons are 21 footdiameter prestressed concrete pipe sophons constructed under specifications DC-7304. These three siphons are the westernmost of six prestressed concrete pipe siphons on the Hayden Rhodes Aqueduct, formerly the Granite Reef Aqueduct, Central Arizona Project. In January 1990 excavation of pipe sections confirmed the existence of serious corrosion of the steel prestressing wire. An emergency response was initiated. Chapter 2 includes a review of relevant history. The design of tendon repairs is one part of the ongoing repair and replacement process. The complexity of the tendon repair design problem results from the uncertaintly of current and future pipe deterioration. The repair design is summarized.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号