首页> 美国政府科技报告 >Comprehensive Facility Review, Report of Findings: Easton Diversion Dam, Easton,Washington
【24h】

Comprehensive Facility Review, Report of Findings: Easton Diversion Dam, Easton,Washington

机译:综合设施审查,调查结果报告:Easton Diversion Dam,Easton,Washington

获取原文

摘要

This report of findings is intended to evaluate the adequacy of Easton DiversionDam in terms of continued safe operation and assess the risk to public safety. The CFR process consists of a thorough evaluation of design, construction, structural performance, and past or ongoing studies to define if there are any dam safety issues that need resolution or further attention, and if specific actions are required to ensure safe continued operation. This report of findings draws upon past reports and studies, as well as the recently complete Modification Decision Analysis (MDA) (1) and the Performance Parameters Technical Memorandum (TM) (2) and Site Examination Report (3) which have been prepared as part of this CFR process.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号