首页> 美国政府科技报告 >Integrated Geographic Information System for Real-Time Operation of AdvancedTraffic Management System
【24h】

Integrated Geographic Information System for Real-Time Operation of AdvancedTraffic Management System

机译:高级交通管理系统实时运行的综合地理信息系统

获取原文

摘要

The report is composed of two parts: the first part (Part II) is dealing withgeneral overview of ITS related issues, and the second part (Part III) is dealing with the development of the prototype. Part II include the sumary of the Transportation Research Information System (TRIS) search results, the summary of the ITS North America Tour by Institute of Transportation Engineers (ITE), the summary of the comparison of data collection technologies, and the summary of Transportation Management Centers in the selected cities. Part III describes the prototype development effort. The prototype is considered as the proof of the concept. Also, a hypothetical synthetic transportation network (freeway, arterial, and local) with 12 nodes and 14 links used.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号