首页> 美国政府科技报告 >Hot Bituminous Pavement QC and QA Projects Constructed in 1996 under QPM 2Specifications
【24h】

Hot Bituminous Pavement QC and QA Projects Constructed in 1996 under QPM 2Specifications

机译:热沥青路面质量控制和质量保证项目于1996年根据Qpm 2规范制定

获取原文

摘要

This report presents Tables and Figures which summarize the HBP Quality LevelAnalysis (QLA) for projects completed in 1996, the second season using the latest significant revision to the specifications. The Quality Level (QL) for the elements (sieve analysis, asphalt content, and pavement density) and the item composites are summarized. While QL determines Pay Factor (PF), it is also used to rank contractors' performance. The item QL improved 1.3 percentage points in 1996 over 1995. But the incentive/distinctive payments were not sufficient to cause some of the contractors to improve their process control. Both, the better and poorer performing contractors show up with similar rankings from year to year. The QLA specifications essentially are serving satisfactorily.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号