首页> 美国政府科技报告 >Highway Planning and Operations for the Dallas District: Freeway System PlanMethodology. Project Summary
【24h】

Highway Planning and Operations for the Dallas District: Freeway System PlanMethodology. Project Summary

机译:达拉斯地区的公路规划和运营:高速公路系统规划方法。项目总结

获取原文

摘要

The System Planning Methodology was developed jointly by the Texas Department ofTransportation (TxDOT), North Central Texas Council of Governments (NCTCOG), Dallas Area Rapid Transit (DART), and Texas Transportation Institute (TTI) as a transportation corridor and system analysis tool that would bridge the gap between regional planning and detailed corridor design. It allows for the examination of peak hour person movement for different facility types within a corridor and estimates associated public costs (e.g., right-of-way, construction, operation, congestion, and environmental costs). The objective of the methodology is to find the lowest total public cost alternative. This project extends the methodology to include costs associated with traffic incidents (nonrecurrent congestion) and tests the results on five corridors in the Dallas area to determine if it alters the recommended alternative previously identified for each corridor. It also adds toll lanes and high occupancy/toll lanes (HOT) as alternatives that can be evaluated against other combinations of general purpose lanes, high occupancy vehicle (HOV) lanes, and express lanes.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号