首页> 美国政府科技报告 >Probability of Failure of the Waste Hoist Brake System at the Waste IsolationPilot Plant (WIPP)
【24h】

Probability of Failure of the Waste Hoist Brake System at the Waste IsolationPilot Plant (WIPP)

机译:废物隔离中试装置(WIpp)废弃提升制动系统失效的可能性

获取原文

摘要

The Department of Energy (DOE) has continues to improve the design and operationof the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP) culminating in a design fully describes in a recent report: a Revised Design, WCAP-13800 (Westinghouse 1994). Component failure data for the report were taken from NPRD-91 (Denson et al. 1991). However shortly after publication of the Revised Design an updating of component failure data became available in the newly published NPRD-95 (Denson et. al 1994).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号