首页> 美国政府科技报告 >Warrants and Criteria for Installing and Sunsetting TXDOT Its Equipment, Project Summary.
【24h】

Warrants and Criteria for Installing and Sunsetting TXDOT Its Equipment, Project Summary.

机译:安装和落标TXDOT其设备的权证和标准,项目摘要。

获取原文

摘要

This project developed guidelines, criteria, and procedures for installing, repairing, and/or removing ITS field devices and systems. The research team: (1) Developed warrant conditions and criteria for assessing when and where to install new ITS devices and systems. (2) Provided sunset requirements and criteria for determining when to no longer support deployed ITS devices and systems. (3) Developed an analytical framework for identifying and prioritizing mission-critical devices and systems for upgrade and maintenance.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号