首页> 美国政府科技报告 >Three-Cable Median Barrier. Final Report.
【24h】

Three-Cable Median Barrier. Final Report.

机译:三线中位数障碍。总结报告。

获取原文

摘要

Oregon public interest peaked regarding crossover highway safety following three fatalities from a crossover accident in August of 1996. The Oregon Department of Transportation (ODOT) conducted a review of possible barrier solutions for the interstate highway median near Salem, Oregon. The weak-post three-cable median barrier system was selected. Unfortunately, there is not much information concerning the maintenance and repair costs of the cable barrier system. This study evaluates the effectiveness of the three-cable barrier in preventing crossover accidents on Interstate 5 (I-5), Oregon Highway Number 1, and evaluates the maintenance and repair costs in order to make recommendations for future installations. Based on the results of the study, the cable median barrier system proved to be cost-effective when compared to the concrete median barrier system and the system performed well, decreasing crossover accidents in the area. The cable median barrier system works well in medians with a minimum of 7 m width, where it is used to prevent the infrequent potentially catastrophic cross-median accidents.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号