Analysis of Input Variables for a Pre-Feasibility Evaluation Model for TollHighways

机译:收费公路预可行性评估模型的输入变量分析

获取原文

摘要

In recent years, private industry has been more involved in highway financing andoperation. Many countries have started to apply new or improved strategies to promote the development of highway projects using sources other than the State. The most widely used concept is the scheme known as Build-Operate-Transfer (B-O-T). The major problem related to private highway participation is the high financial risk involved. This is caused mainly by the difficulty to forecast future revenue because the toll traffic usage, which is the major source of income, is hard to predict accurately. This report analyzes the main variables affecting a toll highway project, and develops mathematical models that describe their behavior. These models can serve as a tool in the decision-making process during the planning and operation of the facility. This study focuses on the develoment of a toll traffic estimation model based on the attributes of the highway and the elasticity of the demand. The goal is to estimate the amount of traffic that could be diverted to the toll facility in an existing corridor with a free access road as an alternative route. Some possible methods to estimate the toll price are discussed as well as an analysis to determine the optimum toll. The Mexican experience is used as a case study to develop empirical models.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号