首页> 美国政府科技报告 >Wisconsin Bicycle Transportation Plan, 2020
【24h】

Wisconsin Bicycle Transportation Plan, 2020

机译:威斯康星州自行车运输计划,2020年

获取原文

摘要

Wisconsin's State Trunk Highway system, consisting of approximately 11,800 miles of roads, is aging and deteriorating at the same time traffic congestion is increasing. In response to this critical issue, WisDOT, in partnership with its stakeholders, developed the State Highway Plan 2020, a 21-year strategic plan which considers the highway system's current condition, analyzes future uses, assesses financial constraints and outlines strategies to address Wisconsin's preservation, traffic movement, and safety needs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号