首页> 美国政府科技报告 >Camber Study of Mn/DOT Prestressed Concrete I-Girders
【24h】

Camber Study of Mn/DOT Prestressed Concrete I-Girders

机译:mn / DOT预应力混凝土I梁的弯度研究

获取原文

摘要

The project investigated the relationship between predicted and measured girdercambers. For more than three years, researchers collected camber data on girders of various depths and lengths from the time of strand release until shipment to the job site. Researchers used three camber prediction methods to compare with measured values: PCI method, Branson's time-step approach, and 'CRACK' analysis program by Ghali et. al. The Branson time-step approach resulted in the closest predictions to the measured cambers. The PCI method, although simple, gave reasonable long-term camber results compared with the more detailed methods.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号