首页> 美国政府科技报告 >Development Length of 0.6-Inch Prestressing Strand in Standard I-Shaped Pretensioned Concrete Beams.
【24h】

Development Length of 0.6-Inch Prestressing Strand in Standard I-Shaped Pretensioned Concrete Beams.

机译:标准I形预拉伸混凝土梁0.6英寸预应力钢绞线的发展长度。

获取原文

摘要

The use of 0.6 in prestressing strand at a center-o-center spacing of 2 in allows for the optimal implementation of High Strength Concrete (HSC) in precast, prestressed concrete bridge superstructures. For this strand configuration, partial debonding of strands is a desirable alternative to the traditional method of draping to alleviate extreme concrete stresses after prestress release. Experimental evidence suggests that existing code provisions addressing the anchorage of pretensioned strands do not adequately describe their behavior. In addition, the anchorage behavior of partially debonded strands is not fully understood. Results are reported from a research study to determine the anchorage behavior of 0.6 in strands at 2 in spacing in full-size, plant-cast AASHTO Type I I-beams. The use of pull-out capacities and strand draw-in measurements to predict the anchorage behavior of prestressing strands was also examined. Along with recommended design procedures for anchorage of prestressing strand, a review of the evolution and shortcomings of existing code provisions is presented.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号