首页> 美国政府科技报告 >Hot-Mix Asphalt Pavement Construction Report for the 1993-2000 FHWA Accelerated211 Loading Facility Project
【24h】

Hot-Mix Asphalt Pavement Construction Report for the 1993-2000 FHWA Accelerated211 Loading Facility Project

机译:1993-2000 FHWa accelerated211装载设施项目的热拌沥青路面施工报告

获取原文

摘要

The Federal Highway Administration is conducting studies to validate Superpave211u001ebinder and mixture tests using its Accelerated Loading Facility (ALF). The ALF is 211u001ea full-scale pavement testing machine that applies one-half of a single rear 211u001etruck axle load. Several other tests that have been developed to predict the 211u001eperformances of asphalt mixtures, such as wheel-tracking devices, are also being 211u001eevaluated. Twelve pavements were constructed at the Turner-Fairbank Highway 211u001eResearch Center in 1993. The rutting and fatigue cracking susceptibilities of the 211u001epavements are to be determined using the ALF. This report documents the mixture 211u001edesigns, construction procedures, and quality control and quality assurance tests 211u001efor the asphalt pavement layers.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号