首页> 美国政府科技报告 >Demonstration Project 103: Design and Construction Monitoring of Soil Nail Walls.211 Project Summary Report
【24h】

Demonstration Project 103: Design and Construction Monitoring of Soil Nail Walls.211 Project Summary Report

机译:示范项目103:土钉墙的设计和施工监测.111项目总结报告

获取原文

摘要

The purpose of Demonstration Project 103 was to introduce the concept of soil211u001enailing use into the American transportation construction practice. The Manual 211u001efor Design and Construction Monitoring of Soil Nail Walls (FHWA-SA-96-069R) and 211u001eSoil Nailing Field Inspectors Manual (FHWA-SA-93-068) were published as a part of 211u001ethis demonstration project. Also, GOLDNAIL (soil nail design software) wad 211u001edeveloped and distributed thru this demonstration project. This report is a 211u001esummary of the activities of Demonstration Project 103. It includes the history, 211u001econcept, construction procedures and cost data for soil nail walls.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号