首页> 美国政府科技报告 >Track Inspection Planning and Risk Measurement Analysis.
【24h】

Track Inspection Planning and Risk Measurement Analysis.

机译:跟踪检查计划和风险测量分析。

获取原文

摘要

This project models track inspection operations on a railroad network and discusses how the inspection results can be used to measure the risk of failure on the tracks. In particular, the inspection times of the tracks, inspection frequency of the tracks, and times between consecutive inspections on the same tracks should be considered for scheduling inspections on the railroad tracks. Furthermore, an inspection plan should schedule inspections considering the characteristics of different tracks. Therefore, it is important to schedule track inspections such that the potential defects are captured as much as possible within minimum times to increase safety. The project formulates a mathematical optimization problem for the track inspection planning considering the practical settings of track inspection operations such as inspection times, inspection frequencies required, time between consecutive inspections, and importance of distinct tracks. The two objectives simultaneously captured in this model are minimization of total inspection times and maximization of the weighted inspections. An efficient solution method is proposed for solving this model. The solution method is compared to a scheduling procedure, which can be used in absence of the findings in this project, on a set of railroad track networks of different sizes. Based on the comparison, the solution method proposed proves to find improved inspection schedules regardless of the railroad network size. A review of the techniques on how to use the inspection results to measure risk of failure is provided.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号