首页> 美国政府科技报告 >Determination of Interrelationships between Organizational System Variables211 during Implementation of Change. Plan for Modifying the Scheduling System at Oahu 211 District. Report 12 of 17
【24h】

Determination of Interrelationships between Organizational System Variables211 during Implementation of Change. Plan for Modifying the Scheduling System at Oahu 211 District. Report 12 of 17

机译:变更实施过程中组织系统变量211之间相互关系的确定。计划修改瓦胡岛211区的调度系统。报告12 of 17

获取原文

摘要

A brief plan is submitted to enhance the scheduling system at Oahu District. The211u001eengineers at Oahu District are perceived to require substantial training in the 211u001euse of modern scheduling systems using conventional software. A training program 211u001eis proposed. The scheduling specifications are also perceived to be in need of 211u001erevision. The scheduling specifications and requirements are proposed to be 211u001edivided into three categories-low cost projects, medium cost projects, and high 211u001ecost projects.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号