首页> 美国政府科技报告 >Destin Dome 56 Unit Development and Production Plan and Right-of-Way Pipeline211 Application. Draft Environmental Impact Statement. Volume 2: Figures and Tables
【24h】

Destin Dome 56 Unit Development and Production Plan and Right-of-Way Pipeline211 Application. Draft Environmental Impact Statement. Volume 2: Figures and Tables

机译:Destin Dome 56单元开发和生产计划以及通行权管道211应用。环境影响声明草案。第2卷:数字和表格

获取原文

摘要

The MMS prepared this environmental impact statement (EIS) on Chevron's plan to211u001edrill 20 new wells within the Destin Dome (DD) 56 Unit, to produce up to 450 211u001etrillion cubic feet of natural gas per day, and to transport the gas through 211u001epipelines to processing plants in Alabama. The 11 blocks that make up the DD 56 211u001eUnit were leased from the Federal Government by Chevron during the 1980's. 211u001eChevron has already drilled three exploratory wells within the Unit, which showed 211u001ethat there is a great quantity of natural gas about 24,000 feet below the 211u001eseafloor. The closes point of the Unit to the coastline of the Florida Panhandle 211u001eis about 25 miles due south of Pensacola, Florida. Volume II contains the figures 211u001eand tables referenced in Volume I.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号