首页> 美国政府科技报告 >Investigation of Closure Pour Elimination for Phased Construction of Steel Girder Bridges.
【24h】

Investigation of Closure Pour Elimination for Phased Construction of Steel Girder Bridges.

机译:钢梁桥分阶段施工关闭消除的研究。

获取原文

摘要

Phased construction is a common practice used by State DOTs during the replacement of a bridge. This method allows for the traffic flow to be maintained on half of the bridge while a new deck is constructed on the other half. For steel girder bridges there is often an issue with differential elevation between the phases. This difference in elevation often prevents the second half of the deck from being poured in one step. Instead, a portion of the second half of the deck is poured and then a third phase, closure pour is used to connect the first two poured slabs. This closure pour can significantly extend the construction time and increase the cost of the deck. The enclosed investigation assesses the deflection of a phased constructed steel girder bridge in Bellevue, Nebraska. The camber and deflection data, of the phases, from the design specs was compared to a numerical model and tilt sensor readings. The finite element model was analyzed the CSI Bridge structural analysis software. The numerical results were on trend with the design specs, although the values were slightly larger. Therefore, calibration is needed for the finite element model. Six weeks of daily deflection data was captured by the EL-tilt sensor. However, due to several issues the further data mining is required before comparisons can be made to the design plans and numerical results.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号