Contingency Operations: Army Should Do More to Control Contract Cost in theBalkans

机译:应急行动:陆军应该做更多的事情来控制巴尔干地区的合同成本

获取原文

摘要

The U.S. military has relied on contractors to provide supplies and services insupport of major contingencies since the Revolutionary War. In the past decade, however, deployed U.S. forces have increased significantly their dependence on contractors for support. In the Balkans, the primary contractor houses, feeds, and provides a range of other services to about 11,000 troops and played a key role in building the base camps in Bosnia and Kosovo. The Department of Defense (DOD) has increasingly relied on contractors rather than soldiers to provide some services in the Balkans as force-level ceilings have been reduced, and contracts for support services represented over $2 billion of the more than $13.8 billion spent on Balkan operations through March 2000. Moreover, we have identified defense contract management as a high-risk area of government spending. Based on the magnitude of contractor costs and the need to ensure that services are provided as efficiently as possible, you asked us to determine whether there are opportunities to improve contractor utilization and reduce costs of Balkan operations without jeopardizing mission success. This report assesses whether (1) the Army is taking effective actions to contain costs and (2) improvements are needed in how the Army and other DOD agencies involved in Balkan operations manage activities under the primary Balkan contract.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号