首页> 美国政府科技报告 >Cost Savings on Highway Projects Utilizing Subsurface Utility Engineering
【24h】

Cost Savings on Highway Projects Utilizing Subsurface Utility Engineering

机译:利用地下公用工程公路项目节约成本

获取原文

摘要

The Federal Highway Administration (FHWA) has been promoting the use ofsubsurface utility engineering (SUE) since 1987 as a means to save costs on highway construction projects. In 1996, the FHWA commissioned Purdue University to study the cost savings from four States C departments of transportation (DOTs) that routinely utilize utility quality levels while producing contract drawings. A total of seventy-one projects (71) from Virginia, North Carolina, Texas, and Ohio were studied. The total construction costs of these projects were in excess of one billion dollars. These projects involved a mix of interstate, arterial, and collector roads in urban, suburban, and rural settings. DOT project managers, utility owners, constructors, and designers were interviewed. Two broad categories of savings emerged: quantifiable savings and qualitative savings. A total pf $4.62 in savings for every $1.00 spent on SUE was quantified. Qualitative savings were non-measurable, but it is clear that those savings are also significant and may be many times more valuable than the quantifiable savings. Only three projects returned less in savings than expenditures. This leads to the conclusion that SUE is a viable technologic practice that reduces project costs related to the risks associated with existing subsurface utilities and should be used in a systematic manner.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号