首页> 美国政府科技报告 >Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes: The Second Strategic Highway Research Program.
【24h】

Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes: The Second Strategic Highway Research Program.

机译:将可靠性绩效指标纳入交通规划和规划流程:第二个战略性公路研究计划。

获取原文

摘要

The objective of SHRP 2 Reliability Project L05, Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes, is to provide guidance to transportation planning agencies on incorporating reliability into the transportation planning, programming, and budgeting processes. This final report summarizes this effort, providing a foundation of knowledge and research on which the products of this project were developed. Chapter 2 of the final report reviews domestic and international literature describing current research and practical use of travel time reliability in transportation planning. Chapter 3 summarizes results from a survey of state departments of transportation (DOT) and metropolitan planning organizations (MPO) that uncovers the current state of the practice of using travel time reliability in transportation planning. Chapter 4 summarizes case studies of agencies that currently are working to incorporate reliability into their transportation planning processes. Chapter 5 summarizes the technical reference (travel time reliability performance measures, strategies for improving travel time reliability, and tools available for measuring the impacts strategies have on travel time reliability); and Chapter 6 describes the framework for incorporating reliability performance into the transportation planning process. Figure 1.1 shows the overall structure of the L05 research project and describes the linkages among its deliverables. The key deliverables of this project are (1) the guide, a brief, descriptive howto that explains how to incorporate reliability into the key steps in transportation planning and programming; and (2) the technical reference, a detailed how-to for estimating reliability.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号