首页> 美国政府科技报告 >Assessment of METROLift Paratransit Scheduling System
【24h】

Assessment of METROLift Paratransit Scheduling System

机译:mETROLift辅助客运系统调度系统评估

获取原文

摘要

This report documents the results of a project exploring the use of advancedtechnologies to improve specialized transportation service delivery. The project examined the benefits of METROLift's paratransit scheduling system, which uses the PASS software by Trapeze, and analyzed available capacity or slack time in the METROLLift vehicle manifests. Three options for expanding METROLift capacity were examined: filling usable slack time, shifting some paratransit trips to fixed-route transit through trip-by-trip eligibility, and integrating paratransit trip segments with fixed-route segments. Of these options, trip-by-trip eligibility appears to offer the greatest potential for increasing the number of METROLift passengers carried on a daily basis, without compromising service quality.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号