首页> 美国政府科技报告 >Evaluation of Rocky Point Viaduct Concrete Beam
【24h】

Evaluation of Rocky Point Viaduct Concrete Beam

机译:岩点高架桥混凝土梁的评估

获取原文

摘要

This study was intended to determine why it was necessary to replace the RockyPoint Viaduct (1954-1994), on the Oregon coast south of Port Orford, after a period of service that was much shorter than that of many other reinforced concrete bridges on the Oregon coast; to identify construction practices that may have contributed to its early failure; and to identify evaluation methods that are most effective for characterizing bridge condition. A 14.3 m (47 foot) section of concrete Beam A1 and bridge deck between the north abutmen5t and pier 1 was removed from the seaward side of the Viaduct for evaluation of: (1) concrete properties; (2) reinforcing bar (rebar) corrosion; and (3) chloride migration in the concrete.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号