首页> 美国政府科技报告 >Methods to Reduce Built-in Residual Stresses in Steel Bridge Diaphragms (Phase I)
【24h】

Methods to Reduce Built-in Residual Stresses in Steel Bridge Diaphragms (Phase I)

机译:减少钢桥隔板内置残余应力的方法(第一阶段)

获取原文

摘要

This investigation determined the magnitude and origin of residual stresses inplate girders, diaphragms and stiffeners built-in during construction. Residual stresses can contribute to crack formation. Three different steel bridges were studied: (1) a multi-girder bridge anchored at the abutments with no center pier; (2) a 4-span continuous multi-girder bridge with piers; (3) a movable, double-leaf bascule bridge. Bridges were instrumented with strain gages at the fabricator. Changes in reference strains were monitored: (1) after steel erection and bolt-up; (2) after deck placement; and (3) after parapet placement.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号