首页> 美国政府科技报告 >Design and Construction Guidelines for MSE Walls with Independent Full-HeightFacing Panels
【24h】

Design and Construction Guidelines for MSE Walls with Independent Full-HeightFacing Panels

机译:具有独立全高度面板的msE墙的设计和施工指南

获取原文

摘要

In 1996, the Colorado DOT completed the construction of a unique mechanicallystabilized earth (MSE) wall with an independent full-height facing (IFF) for the ramp connecting northbound Interstate-25 to Interstate-70 in Denver, Colorado. The new MSE/IFF wall has four major components: (1) a self-stable welded wire fabric (WWF) reinforced soil mass, (2) full-height concrete facing panels not attached to the soil reinforcements (i.e., independent) that are allowed to tilt around their base, (3) flexible face anchors to provide for attachment of facing panels to the reinforced soil mass and accommodate movements of the wall system, and (4) a trench with flowfill to brace the panels during construction only (before the face anchors are placed). Since this MSE wall system is the first of its kind, it was considered experimental and a comprehensive instrumentation and monitoring program was performed. The main objective of this study was to upgrade the I-25/I-70 MSE/IFF wall that would improve performance and save money and time. This report provides insight into material, construction, construction problems and corrective actions, monitoring, performance and design assessment of the I-25/I-70 MSE/IFF wall. The wall system performed as intended in the design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号