首页> 美国政府科技报告 >Value of Construction Put in Place: January 2001. Current Construction Reports
【24h】

Value of Construction Put in Place: January 2001. Current Construction Reports

机译:建设施工价值:2001年1月。当前施工报告

获取原文

摘要

The purpose of this document is to provide a monthly estimate of the total dollar value of construction work done in the U.S. The United States Code, Title 13, authorizes this program and provides for voluntary responses. The coverage includes all construction work done each month on new private residential and non-residential construction, public construction, and improvements to exiting buildings and structures. Data estimates include the cost of labor and materials; cost of architectural and engineering work, overhead costs; interest and taxes paid during construction; and contractor's profits. Data collection and estimation activities begin on the first day after the reference month and continue for about 3 weeks. Reported data and estimates are for activity taking place during the previous calendar month. The survey has been conducted monthly since 1960.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号