首页> 美国政府科技报告 >Evaluation of the Implementation of Hot Pour Sealants and Equipment for Crack Sealing in Indiana (An Implementation of Research Results for SPR-2076);Final rept
【24h】

Evaluation of the Implementation of Hot Pour Sealants and Equipment for Crack Sealing in Indiana (An Implementation of Research Results for SPR-2076);Final rept

机译:评估印第安纳州裂缝密封用热灌封密封剂和设备的实施情况(spR-2076研究结果的实施);最终报告

获取原文

摘要

This study was initiated as an implementation effort that would monitor, assist with and report on a new maintenance activity involving the trial use of hot pour crack sealant. Work associated with this new activity was qualitatively assessed over a period of several years. INDOT began by purchasing six oil-jacketed melters that were distributed to various sub-districts. Previous INDOT research indicated using hot pour sealant might save on labor expense because it lasted significantly longer than the current emulsion. Random observations were made of various sub-district crews using hot pour sealant and the results were reported to appropriate personnel. Inspection were made on field operations and equipment performance. The study resulted in the preparation of a written work activity, development of general guidelines for sealing, creation of a training video, the exchange of information and reporting of findings. As a result of this study and other efforts INDOT has purchased several more melters with improved features. The total volume of hot pour sealing being conducted is relatively small compared to emulsion sealing. Currently INDOT spends over two million dollars on crack sealing efforts. This study has prompted the need to conduct research that will examine the cost effectiveness of crack sealing.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号