首页> 美国政府科技报告 >Final Environmental Assessment: Morrow Point Cimarron Dredging Project.
【24h】

Final Environmental Assessment: Morrow Point Cimarron Dredging Project.

机译:最终环境评估:morrow point Cimarron疏浚项目。

获取原文

摘要

This Final Environmental Assessment (EA) reviews the proposed action of removing approximately 11,000 cubic yards of deposited material from the upper end of Crystal Reservoir below Morrow Point Dam's tailrace in Montrose County, Colorado. The Bureau of Reclamation (Reclamation) prepared this EA in cooperation with other federal and state agencies to comply with the National Environmental Policy Act (NEPA), Endangered Species Act, and related U.S. Department of the Interior policies and regulations. If, based on this analysis, Reclamation concludes the proposed action would have no significant impact on the human environment, preparation of an Environmental Impact Statement would not be required before the action could be implemented.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号