首页> 美国政府科技报告 >Albania Short Term Power Sector Rehabilitation Projects. Final Report: Volume 2 - Main Report
【24h】

Albania Short Term Power Sector Rehabilitation Projects. Final Report: Volume 2 - Main Report

机译:阿尔巴尼亚短期电力部门恢复项目。最终报告:第2卷 - 主要报告

获取原文

摘要

The United States Trade and Development Agency awarded a grant to the Government of Albania for the purpose of performing a siting and feasibility study for the development of a new thermal generation facility. MWH Management Consulting was retained to conduct two tasks. Task One was to evaluate and select the best site, technology, and fuel for a new base load, thermal generation facility. Task Two was to conduct a feability study to evaluate the technical requirement as well as the environmental, economic, and financial viability of the generation facility at the selected site. On June 21, 2002, the Albanian Ministry of Industry and Energy agreed with MWH's recommendation that it proceed to Task Two. This report documents the results of the feasibility study and reconfirms, where appropriate, the results and recommendations included in the Siting Report.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号