首页> 美国政府科技报告 >How to Prepare a Startup, Shutdown, Malfunction Plan for Collection and Control Systems at Municipal Solid Waste Landfills
【24h】

How to Prepare a Startup, Shutdown, Malfunction Plan for Collection and Control Systems at Municipal Solid Waste Landfills

机译:如何为城市垃圾填埋场的收集和控制系统准备启动,关闭,故障计划

获取原文

摘要

This document explains how to prepare a startup, shutdown, malfunction plan for municipal solid waste landfills. Landfill owners and operators who are affected by the National Emission Standards for Hazardous Air Pollutants for Municipal Solid Waste Landfills (landfills NESHAP) and who must install a collection and control system must prepare a startup, shutdown, malfunction plan (SSM plan). For the landfills SSM plan, the primary concern is with malfunction of the landfill gas collection and controls system, not with the startup and shutdown of the entire source. Therefore, the guidance focuses primarily on the malfunction of the gas collection system, gas control system, and gas treatment system. The document describes what information the SSM plan should contain, to which operations the SSM plan applies, and explains how to keep records and reports. Also included is an appendix with example elements of an SSM plan for MSW landfills.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号