首页> 美国政府科技报告 >Methodology for Optimizing Opening of PCC Pavements to Traffic;Interim rept. Sep 00-Aug 01
【24h】

Methodology for Optimizing Opening of PCC Pavements to Traffic;Interim rept. Sep 00-Aug 01

机译:优化pCC路面开通的方法论;中期评估。 9月00日至8月1日

获取原文

摘要

Due to difficulties associated with the maintenance of highways constructed in urban settings, the expedited construction of durable Portland cement concrete (PCC) pavement has become a necessity. To obtain a durable PCC pavement, a number of parameters should be considered. One important parameter is the adequate curing of a proper mix before opening the road. Since most urban roads experience excessive traffic, the tendency of highway agencies is to open a newly constructed highway to traffic as soon as possible. A rational method to assess the minimum time required to gain a desired strength before opening it to traffic is proposed here. Two reliable and easy-to-use test methods, maturity method and seismic method, are combined to improve the determination of the readiness of a road to be opened to traffic.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号