Instrumented Monitoring and Modeling of WAS-339-2013 Prior to, During and After Superload;Final rept

机译:Was-339-2013的仪表监控和建模在超载之前,期间和之后;最终的rept

获取原文

摘要

Several super loads were scheduled to cross a bridge at the Muskingum River along Route 339 near Marietta (WAS-339-2013) in the summer of 2001. The largest of these (883,488 lbs. or 3,930kN) was the biggest super load in recorded Ohio history. A new power plant was being constructed nearby and huge pieces of equipment were to be transported to the site. However, a BARS-based software analysis conducted by the Structural Engineering Office of the Ohio Department of Transportation revealed possible overload conditions in connection with these load/structure combinations. A permit would not be issued without further evidence of the actual load capacity of the bridge. The bridge in question (WAS-339-2013) is a 2-lane, 6-span, 650-feet (198.250 m) steel-stringer bridge with a reinforced concrete deck, built in 1963, crossing the Muskingum River. The University of Cincinnati Infrastructure Institute (UCII) was contracted to instrument the bridge with strain transducers and conduct a series of controlled experiments with loaded dump trucks to determine the load carrying capacity of the structure. Linear superposition was used to then evaluate and verify the capacity of WAS-339-2013 for the super load passage.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号