首页> 美国政府科技报告 >Cradle-to-Grave Pavement Monitoring of Pavements and Pavement Management Information System (PMIS) Functionality Enhancement Planning: A Summary Project summary rept
【24h】

Cradle-to-Grave Pavement Monitoring of Pavements and Pavement Management Information System (PMIS) Functionality Enhancement Planning: A Summary Project summary rept

机译:从路面到路面的路面和路面管理信息系统(pmIs)功能增强规划:总结项目摘要

获取原文

摘要

Pavements are an important part of the highway transportation infrastructure, accounting for the single largest share of the overall investment. A tremendous amount of time and money is spent each year on the construction of new pavements, as well as on the maintenance and rehabilitation of existing pavements. To maximize benefits and minimize overall costs, a systematic and scientific approach is needed to manage pavements. The objective of pavement management is to maintain or improve the condition of the pavement network and to maximize the performance of the network while keeping the costs to a minimum. In short, it encompasses all the activities associated with a pavement from 'the cradle to the grave.' Pavement management is a complex set of processes that need to be dealt with in a scientific and efficient manner so that accurate results are achieved.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号