Safety Performance Evaluation of the Nebraska Open Bridge Rail on an Inverted Tee Bridge Deck;Final rept. 2001-2003

机译:内布拉斯加州开放式桥梁在倒T型桥面板上的安全性能评估;最终评估。 2001-2003

获取原文

摘要

Nebraska's Open Concrete Bridge Rail attached to an inverted tee bridge deck system was constructed and full-scale vehicle crash tested. The reinforcing design of the bridge rail attachment to the bridge deck was evaluated and redesigned prior to construction. With the redesigned reinforcement details, the 737-mm (29-in.) high bridge rail was constructed 29.57-m (97-ft) long with thirteen bridge posts, each measuring 279-mm (11-in.) wide x 610-mm (24-in.) long x 330-mm (13-in.) high. Post spacings were 2,438 mm (8 ft) on centers. A similar system with the bridge rail attached to the deck with vertical reinforcing bars tied to two layers of reinforcement in the bridge deck was previously certified to meet the Test Level 4 (TL-4) evaluation criteria specified in NCHRP Report No. 350 through testing according to AASHTO Performance Level 2 (PL-2) criteria. Due to this testing, the pickup truck test was the only test necessary to evaluate the safety performance of the bridge rail when attached to thin decks placed on inverted tee bridge girders. Therefore, the research study included one full-scale vehicle crash test using a three quarters-ton pickup truck.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号