首页> 美国政府科技报告 >Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Unity Pond (Lake Winnecook) Waldo County, Maine. Unity Pond PCAP-TMDL Report, Maine DEPLW 2004-0668.
【24h】

Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Unity Pond (Lake Winnecook) Waldo County, Maine. Unity Pond PCAP-TMDL Report, Maine DEPLW 2004-0668.

机译:磷控制行动计划和每日总磷(年磷)负荷报告:Unity池塘(Lake Winnecook)缅因州沃尔多县。 Unity pond pCap-TmDL报告,缅因州DEpLW 2004-0668。

获取原文

摘要

Land use data were determined using several methods, including (1) Geographic Information System (GIS) map analysis, (2) analysis of topographic maps, (3) analysis of town property tax maps and tax data, (4) analysis of aerial photographs and (5) groundtruthing. Much of the undeveloped land use area (i.e., forest, wetland, grassland) was determined using a GIS layer which is a combination of Maine Gap Analysis (GAP) landcover and USGS Multi Resolution Landcover Characterization (MRLC) landcover layers. It was created at the request of Maine DEP Bureau of Land and Water Quality (BLWQ) staff. It includes those classes in each layer which are best suited to calculating impermeability of watersheds. Both MRLC and GAP (and so Maine COMBO) are based on 1992 Landsat imagery. The developed land use areas were obtained using the best possible information available through analysis of methods 2 through 5 listed above.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号