首页> 美国政府科技报告 >Municipal and Industrial Water Shortage Policy, Central Valley Project, California: Environmental Assessment.
【24h】

Municipal and Industrial Water Shortage Policy, Central Valley Project, California: Environmental Assessment.

机译:加州中央山谷项目的市政和工业用水短缺政策:环境评估。

获取原文

摘要

This Environmental Assessment (EA) was prepared to evaluate alternatives considered by the U.S. Bureau of Reclamation (Reclamation) to implement a Municipal and Industrial (M&I) Water Shortage Policy for the Central Valley Project (CVP). The purposes of the policy are to: (1) define water shortage terms and conditions applicable to all CVP M&I contractors, as appropriate; (2) establish CVP water supply levels that, together with the M&I contractors' drought water conservation measures and other water supplies, (a) would sustain urban areas during droughts, and (b) during severe or continuing droughts would assist the M&I contractors in their efforts to protect public health and safety; and (3) provide information to M&I contractors for development of drought contingency plans.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号