首页> 美国政府科技报告 >USAID. Afghanistan. Feasibility Study for the Development of a Gas Fired Thermal Facility in Sheberghan. Inception Report
【24h】

USAID. Afghanistan. Feasibility Study for the Development of a Gas Fired Thermal Facility in Sheberghan. Inception Report

机译:你说。阿富汗。在希比尔甘开发燃气热力设施的可行性研究。初始报告

获取原文

摘要

Issued in late 2004, the FS requires for interested proponents to approach the project in two phases as follows. Phase 1. Prepare a feasibility study of the development, contruction, acceptance and operation and maintenance of a gas fired thermal power facility inclusive of ancillary requirements at Sherbeghan. Phase 2: Finalize, relase and manage the invitation to Bid (ITB) process for the proposed facility under a bid award process which combines Engineering, Procurement Construction (EPC) and Operation and Maintenace (O &M) of the Facility throught the first major overhaul period inclusive of recommendation of Bid award section.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号