首页> 美国政府科技报告 >Assessing MoDOT’s Efforts to Provide the Right Transportation Solution. Tracker Measure 3g.
【24h】

Assessing MoDOT’s Efforts to Provide the Right Transportation Solution. Tracker Measure 3g.

机译:评估moDOT努力提供正确的运输解决方案。跟踪器测量3g。

获取原文

摘要

The basic research design for the project was to sample opinions on a variety of projects spread across the state. A small, medium, and large project from each of the seven MoDOT districts was selected by a regional manager for the project for a total of 21 projects. The sample included 600 addresses per project area for a total of 12,600 Missouri addresses being mailed a copy of the survey. Each survey was focused on one of 21 individual projects, which was briefly described on the survey, and the majority of survey questions related to the recently completed project, such as determining if the completion of the project increased safety, convenience, and made it easier to drive.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号