首页> 美国政府科技报告 >Evaluation of ODOT Roadway/Weather Sensor Systems for Snow and Ice Removal Operations/RWIS Part IV: Optimization of Pretreatment or Anti-Icing Protocol
【24h】

Evaluation of ODOT Roadway/Weather Sensor Systems for Snow and Ice Removal Operations/RWIS Part IV: Optimization of Pretreatment or Anti-Icing Protocol

机译:评估用于除冰和除冰操作的ODOT道路/天气传感器系统/ RWIs第IV部分:预处理或防冰协议的优化

获取原文

摘要

This study addressed pretreatment protocol for winter maintenance of roadways using brine. Information regarding pretreatment was assessed from surveys of personnel in state departments of transportation and county garages in Ohio. Field durability studies of various applications of brine were conducted on Portland cement concrete and asphalt concrete pavements in Ohio. Over three winter seasons, weather events and resulting pavement conditions were documented during pretreatment and during the subsequent events using visual and limited road grip tester (RGT) assessment. In addition, extensive laboratory studies were undertaken to supplement the field investigations. Integration of the findings resulted in a decision tree to aid in operational planning and pretreatment.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号