首页> 美国政府科技报告 >Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction. Final Report for NCHRP Report 574
【24h】

Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction. Final Report for NCHRP Report 574

机译:规划,规划和预建期间公路项目成本估算和管理指南。 NCHRp报告的最终报告574

获取原文

摘要

Project cost escalation is a major problem for State Highway Agencies (SHAs). Over the time span between the initiation of a project and the completion of construction many factors influence a projects final costs. Managing large expenditure construction projects requires the coordination of a multitude of human, organizational, technical, and natural resources. Quite often, the engineering and construction complexities of such projects are overshadowed by economic, societal, and political challenges. This research developed a Guidebook on highway cost estimation practice and cost estimation management aimed at achieving greater consistency and accuracy between planning, programming and preliminary design, and final design. The Guidebook provides appropriate strategies, methods, and tools to develop, track, and document realistic cost estimates during each phase of the process.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号